How Long Does It Take to Install 50 Sqft of Wood Floor? Thinking about adding wood flooring to a tiny space, say 50 square feet? You might question the duration. Fitting hardwood floors in a minuscule room, a narrow corridor, or even a closet, can take different amounts of time. This is due to several things like the wood’s kind, your subfloor’s status, and if you’re getting a pro onboard or planning a DIY project. In this post, we aim to clear up your main concern and offer further details on speeding up or delaying installation, like adapting to temperature changes, assessing your subfloor, and so on.
If you are working with a professional, you can usually expect the installation process for an area as small as 50 square feet to take half a day to one entire day. This is a summary of what usually entails:
Therefore, while the actual installation of the flooring can take only a few hours, the overall timeline for completing a 50 sqft project, including acclimation and any potential subfloor preparation, can take 3-7 days.
Even with a small area like 50 square feet, several variables will determine the exact time it takes to install hardwood flooring:
The type of wood you choose will significantly affect installation time.
It’s important how your subfloor looks. A clean, dry, and flat subfloor means things will go fast. But, if it’s not flat, has damage, or needs more work, like a moisture shield or leveling compound, it will add 1-2 hours or more to the job.
Make sure to inspect the subfloor thoroughly before installation begins to avoid any unexpected delays.
Getting pros to do the job? Their abilities and knowledge play a role in the timeframe. A pro floor fitter might manage a 50 sqft spot in 2-4 hours. But go DIY and the timeframe changes. Without experience, you may need more time.
The space’s design and hurdles can influence the installation time. An uncluttered, open area makes the job faster. But things like cabinets, fireplaces, or anything else in the path will need extra time. Extra time goes to measuring, trimming, and adjusting. These problems may add an extra 2-3 hours or more. Planning to use a unique design (like herringbone or parquet) also makes things slower. It could make the job take 2-3 times longer than usual.
Now let’s break down the typical steps involved in installing 50 sqft of wood flooring:
Before putting down wood flooring, let it adjust to your home’s temperature and dampness. This stops the wood from bending or getting smaller after you’ve installed it. Normally, solid hardwood takes 3-7 days to adjust. But, engineered wood flooring gets used to things quicker – usually within 1-2 days.
It’s important to ensure that the humidity level inside the home remains consistent (30-50%) during this time, and the room temperature should stay between 60°F and 80°F (15°C to 26°C).
When the wood’s ready, we deal with the subfloor next. Clean it up, watch for damp spots, even it out if needed. A good floor only needs an hour or two. But, if we have to fix stuff, it might take more time.
For a small space like 50 sqft, professional installers can usually complete the actual installation in 2-4 hours, especially if there are no complex cuts or patterns involved. The installers will measure and cut the boards to fit the space, ensuring that each plank is laid properly.
For raw wood, you have to add extras like stains, seals, and layers of polyurethane. This adds 1-2 hours and the floor needs dry-time. With already finished wood, no need for this step. Your floor’s set to use right away.
While a 50 sqft flooring project may seem straightforward, there are a few factors that can add extra time to the installation process:
Wood flooring’s time to settle and dry after fitting is influenced by humidity. In places with lots of humidity, the damp air can slow down the settling period and the drying of finishes. Living in such a humid place may tack on an extra couple of days to the whole process.
If you choose a complex layout such as herringbone, parquet, or another intricate pattern, it will require more time for the installer to cut, measure, and lay the flooring. This can increase installation time by 2-3 times compared to a simple, straight-lay installation.
Sometimes, issues with the subfloor are discovered only during the preparation stage. Uneven floors or moisture problems can delay the project by 1-2 days. It’s essential to have your subfloor inspected beforehand to avoid surprises.
For a typical hardwood flooring installation (not limited to 50 sqft), the timeline can range from 1-3 days depending on the scope of the project. For larger areas or more complex installations, it can take longer.
The process will take noticeably more time if you are laying hardwood flooring over a sizable area (more than 1,000 square feet) in several rooms. Big projects might last 5 – 10 days. This follows from the extra time required for:
For smaller spaces, such as a 50 sqft room, the process can be much quicker, as discussed earlier, usually within 1 day for installation, assuming there are no significant issues with the subfloor.
Putting wood flooring in a 50 square foot small space is rather quick. Should all be in order—your wood has acclimated, the subfloor is ready, and there are no significant challenges—you should anticipate the installation taking professionals 4 – 6 hours, or somewhat more if you are doing the job yourself. Remember that the whole timeline will be influenced by things including humidity, subfloor condition, and any custom patterns or cuts.
By carefully preparing and choosing the right type of wood for your project, you can achieve a beautiful, lasting floor in no time. Whether you’re opting for DIY installation or hiring a professional, planning ahead will ensure that your flooring installation is smooth and efficient.