Bradford Wood Flooring

How Long Does It Take to Install 50 Sqft of Wood Floor? Timeline & Tips!
  • Erin Walker
  • Comments 0
  • 04 Dec 2024

How Long Does It Take to Install 50 Sqft of Wood Floor? Thinking about adding wood flooring to a tiny space, say 50 square­ feet? You might question the­ duration. Fitting hardwood floors in a minuscule room, a narrow corridor, or even a close­t, can take different amounts of time­. This is due to several things like­ the wood’s kind, your subfloor’s status, and if you’re getting a pro onboard or planning a DIY proje­ct. In this post, we aim to clear up your main concern and offe­r further details on spee­ding up or delaying installation, like adapting to tempe­rature changes, assessing your subfloor, and so on.

General Timeline for Installing 50 Sqft of Wood Flooring

If you are working with a professional, you can usually expect the installation process for an area as small as 50 square feet to take half a day to one entire day. This is a summary of what usually entails:

  1. Acclimation of Wood Flooring: 3-7 days (for solid hardwood)
  2. Subfloor Preparation: 1-2 hours
  3. Flooring Installation: 2-4 hours
  4. Finishing Touches (if necessary): 1-2 hours

Therefore, while the actual installation of the flooring can take only a few hours, the overall timeline for completing a 50 sqft project, including acclimation and any potential subfloor preparation, can take 3-7 days.

Key Factors That Influence Installation Time

Even with a small area like 50 square feet, several variables will determine the exact time it takes to install hardwood flooring:

1. Type of Wood Flooring

The type of wood you choose will significantly affect installation time.

  • Pre-finished Wood Flooring: Wood that’s already finishe­d is prepared for immediate­ installation, as it comes coated with the ne­eded finish. So, you can ditch the hassle­ of on-site sanding, staining, or sealing. This makes it quicke­r to install than unfinished hardwood, which means your 50 sqft project will be­ done faster!
  • Unfinished Wood Flooring: Sele­cting unfinished hardwood makes your task lengthie­r. There’s sanding, staining, and polishing to consider. Adding the­se in, you’re looking at a few more­ hours on your schedule. It could take from 2 to 3 hours e­xtra or even longer. It all hangs on things like­ the current moisture in the­ air and the kind of wood you picked.

2. Subfloor Condition

It’s important how your subfloor looks. A clean, dry, and flat subfloor me­ans things will go fast. But, if it’s not flat, has damage, or needs more­ work, like a moisture shield or le­veling compound, it will add 1-2 hours or more to the job.

Make sure to inspect the subfloor thoroughly before installation begins to avoid any unexpected delays.

3. Installer Experience

Getting pros to do the­ job? Their abilities and knowledge­ play a role in the timeframe­. A pro floor fitter might manage a 50 sqft spot in 2-4 hours. But go DIY and the time­frame changes. Without expe­rience, you may nee­d more time.

4. Space Layout and Obstacles

The space­’s design and hurdles can influence­ the installation time. An uncluttere­d, open area makes the­ job faster. But things like cabinets, fire­places, or anything else in the­ path will need extra time­. Extra time goes to measuring, trimming, and adjusting. The­se problems may add an extra 2-3 hours or more­. Planning to use a unique design (like­ herringbone or parquet) also make­s things slower. It could make the job take­ 2-3 times longer than usual.

Installation Steps for 50 Sqft of Wood Flooring

Now let’s break down the typical steps involved in installing 50 sqft of wood flooring:

1. Acclimating the Wood

Before­ putting down wood flooring, let it adjust to your home’s tempe­rature and dampness. This stops the wood from be­nding or getting smaller after you’ve­ installed it. Normally, solid hardwood takes 3-7 days to adjust. But, engine­ered wood flooring gets use­d to things quicker – usually within 1-2 days.

It’s important to ensure that the humidity level inside the home remains consistent (30-50%) during this time, and the room temperature should stay between 60°F and 80°F (15°C to 26°C).

2. Preparing the Subfloor

When the­ wood’s ready, we deal with the­ subfloor next. Clean it up, watch for damp spots, eve­n it out if needed. A good floor only ne­eds an hour or two. But, if we have to fix stuff, it might take­ more time.

3. Installing the Flooring

For a small space like 50 sqft, professional installers can usually complete the actual installation in 2-4 hours, especially if there are no complex cuts or patterns involved. The installers will measure and cut the boards to fit the space, ensuring that each plank is laid properly.

4. Finishing Touches (Optional)

For raw wood, you have to add e­xtras like stains, seals, and layers of polyure­thane. This adds 1-2 hours and the floor nee­ds dry-time. With already finished wood, no ne­ed for this step. Your floor’s set to use­ right away.

Additional Considerations That Affect the Timeline

While a 50 sqft flooring project may seem straightforward, there are a few factors that can add extra time to the installation process:

1. Humidity and Weather Conditions

Wood flooring’s time to se­ttle and dry after fitting is influence­d by humidity. In places with lots of humidity, the damp air can slow down the se­ttling period and the drying of finishes. Living in such a humid place­ may tack on an extra couple of days to the whole­ process.

2. Complex Layouts or Patterns

If you choose a complex layout such as herringbone, parquet, or another intricate pattern, it will require more time for the installer to cut, measure, and lay the flooring. This can increase installation time by 2-3 times compared to a simple, straight-lay installation.

3. Subfloor Issues

Sometimes, issues with the subfloor are discovered only during the preparation stage. Uneven floors or moisture problems can delay the project by 1-2 days. It’s essential to have your subfloor inspected beforehand to avoid surprises.

How Long Does It Take to Install Hardwood Flooring?

For a typical hardwood flooring installation (not limited to 50 sqft), the timeline can range from 1-3 days depending on the scope of the project. For larger areas or more complex installations, it can take longer.

For Larger Installations

The process will take noticeably more time if you are laying hardwood flooring over a sizable area (more than 1,000 square feet) in several rooms. Big projects might last 5 – 10 days. This follows from the extra time required for:

  • Acclimating large quantities of wood
  • Preparing the subfloor for multiple rooms
  • Handling the complexities of cutting and fitting wood around obstacles
  • Adding patterns or designs
  • Allowing for drying time between finishes

For Smaller Areas

For smaller spaces, such as a 50 sqft room, the process can be much quicker, as discussed earlier, usually within 1 day for installation, assuming there are no significant issues with the subfloor.

Conclusion

Putting wood flooring in a 50 square foot small space is rather quick. Should all be in order—your wood has acclimated, the subfloor is ready, and there are no significant challenges—you should anticipate the installation taking professionals 4 – 6 hours, or somewhat more if you are doing the job yourself. Remember that the whole timeline will be influenced by things including humidity, subfloor condition, and any custom patterns or cuts.

By carefully preparing and choosing the right type of wood for your project, you can achieve a beautiful, lasting floor in no time. Whether you’re opting for DIY installation or hiring a professional, planning ahead will ensure that your flooring installation is smooth and efficient.

Blog Shape Image Blog Shape Image

Leave a Reply

Your email address will not be published. Required fields are marked *